The sandwich system gets its name from two different materials layered on top of each other: a rubber granule base that provides elasticity and a hard-wearing poured polyurethane top. This build-up lasts much longer than sprayed systems and costs less than a full PU system.
Total thickness is usually around 13 mm. Heavily loaded zones (high jump take-off, end of the javelin runway, steeplechase water jump exit) are built thicker.
Before work starts, the asphalt is checked with a 4 m straightedge, low spots are corrected and the surface is cleaned of dust and oil. The asphalt must be fully cured; otherwise volatiles can cause blisters in the surface.
A polyurethane primer is applied to the asphalt. The SBR base is then laid in continuous strips with a laser-controlled paver. Clean joints between strips are essential to avoid visible marks.
After the base has cured, the pore filler is squeegeed in. The polyurethane is then poured at an even thickness with a notched trowel or squeegee and EPDM is broadcast immediately. Temperature and humidity are monitored, and no pouring is done when rain is expected.
Once the surface has reached sufficient strength, surplus granules are removed, the track is surveyed and lines are painted.
Where budget comes first in schools and training grounds, spray coat is common; for national and regional competition tracks the sandwich system is the usual choice; and for stadiums hosting international championships with very heavy use, full PU stands out. For a detailed comparison read our athletics track surface systems comparison.
SFS Engineering installs sandwich systems on a turnkey basis together with groundworks, drainage and equipment as part of its athletics track construction projects.
No. Because of the pore filler and the poured polyurethane layer, the sandwich system is impermeable. Rainwater is directed to drainage channels by the surface slope.
Usually around 13 mm in total: about 9–10 mm of SBR base and 3–4 mm of poured polyurethane with EPDM granules.
Yes. The product system must hold a World Athletics product certificate, and the facility must pass the survey and on-site tests.
Yes. The worn surface can be cleaned and covered with a new polyurethane and EPDM layer while the SBR base stays in place.
Get technical support for your project: SFS Engineering handles site survey, design, material selection and installation as a single contractor. Send us your dimensions and site details through our contact page and we will work out the right solution together.