Full PU Athletics Track Installation: A Guide to Full Polyurethane Tracks

In a full PU system the entire thickness of the track is poured polyurethane. Its uniform structure, high wear resistance and consistent performance make it the top-level in-situ system preferred for international competition tracks.


The full PU (full polyurethane or "full pour") system is the highest class of in-situ athletics track surfaces. While a sandwich system has an SBR rubber base at the bottom, a full PU system is polyurethane-based throughout. This gives the same elasticity, grip and durability at every point of the track.

How is a full PU system built up?

A full PU surface consists of two-component polyurethane poured on the asphalt in layers. Lower layers may contain rubber granules within the polyurethane for elasticity; on top, EPDM granules are broadcast into the final pour. The result is a solid, void-free, impermeable surface.

  • Primer: bonds the polyurethane to the asphalt.
  • Poured polyurethane body: makes up most of the thickness and self-levels to an even surface.
  • Top pour and EPDM broadcast: creates a textured, slip-resistant surface suited to spikes.
  • Line paint: UV-resistant polyurethane line paint.

Total thickness is usually designed at 13 mm and increased in zones such as the high jump take-off area and the end of the javelin runway.

Advantages of the full PU system

  • Uniform performance: with no material change between layers, force reduction and energy return are more consistent across the track.
  • High wear resistance: the most durable in-situ system under spikes, intensive training and competition.
  • Long service life: keeps its performance for many years with proper care; a worn surface can be refreshed with a re-top.
  • Impermeable: water flows off into drainage channels, so the surface never becomes saturated and is protected from freeze-thaw.
  • Suited to international competition: World Athletics-certified full PU systems are widely chosen for stadiums aiming for a Class 1 facility certificate.

Full PU installation stages

1. Asphalt check

Because full PU self-levels, the evenness and slopes of the asphalt are critical. The surface is checked with a straightedge, level errors are corrected and the surface is cleaned.

2. Primer and body pour

After priming, the polyurethane is mixed with a metering machine and poured with a gauge-controlled squeegee. The target thickness is reached in more than one layer.

3. Top layer and EPDM

The final polyurethane layer is poured and EPDM granules are broadcast while it is wet. After curing, loose granules are swept off.

4. Survey, line marking and testing

The track is surveyed and lines are painted. If certification is planned, thickness, force reduction, vertical deformation, friction and evenness are tested on site by an accredited laboratory.

Which facilities is full PU for?

Full PU is ideal for heavily used tracks such as stadiums hosting international championships, national team training centres, universities and club facilities. If the budget is limited, the sandwich system is a strong competition-level alternative. See the differences in our comparison article.

Maintenance tips

Full PU tracks should be swept regularly, kept free of leaves and sand, and washed with low-pressure water at least once a year. Vehicles, scaffolding and sharp equipment must not be placed on the surface, and protective panels should be used during events. Lines and channel covers should be checked periodically.

SFS Engineering installs full PU systems together with groundworks, drainage, line marking and athletics equipment in its athletics track construction projects.

Frequently Asked Questions

What is the difference between full PU and a sandwich system?

A sandwich system has an SBR rubber base with 3–4 mm of poured polyurethane on top. In a full PU system the whole surface is poured polyurethane, giving more uniform performance and higher durability.

Is a full PU track permeable?

No, full PU is solid and impermeable. Rainwater is directed to drainage channels by the surface slope.

How long does a full PU track last?

Depending on use and maintenance it lasts many years. A worn top surface can be renewed without removing the system.

Does full PU require asphalt?

Asphalt is the standard base for outdoor tracks. Indoors it can also be applied on an even, dry concrete slab.